Production management does not only refer to block processing. It includes: slab cutting, processing project materials, and turning discarded smaller pieces into mosaics and small-sized slabs.
All of this comes down to one principle: maximizing the utilization of mineral resources.
We have learned this through experience.
In 2024, due to a lack of material selection knowledge, we shipped many defective blocks back to China. The result was a loss on freight costs and no market demand.
In 2025, we began to establish a systematic block management process:
blocks are first washed, cracks are carefully examined, and only then do we decide whether they should be shipped to China.
Materials that do not meet standards are further downsized, while those approved for shipment must be of good quality.